Designed by Quality Design Solutions, RCG delivered the construction of a new warehouse facility, developing the site into a high‑quality industrial asset with a strong commercial outcome for the client. The project involved shaping the building from the ground up, integrating the structural elements, services and fitout required to bring the design to life and prepare the facility for market.
Delivered within a seven‑month programme, the works demanded disciplined planning and careful coordination with Work Safe and tower‑crane operators to safely manage high‑risk tilt‑panel lifting operations. Throughout construction, RCG maintained firm programme control, rigorous safety oversight and consistent quality management, ensuring the development progressed smoothly from early works through to completion.
CLIENT:
LOCATION:
81 Dundas Road, High Wycombe WA 6057
SIZE:
1,200m²
YEAR COMPLETED:
2025
SCOPE:
• Earthworks
• Inground services
• Construction of concrete slab
• Construction & installation of concrete tilt panels
• Structural steel installation
• Mezzanine level construction
• New roof structure & building closure
• Curtain wall cladding
• External glazing
• Installation of services: electrical, fire, hydraulic, mechanical
• UAT & wet areas
• Bitumen car park construction
• Finishes: tiling, cabinetry, floor finishes, painting, signage
• Landscaping
• Fit off of services